The conversion of this blocky office building dating from the 1970s makes what was formerly a self-centred foreign body into an integral part of the district. Our aim, however, was not to domesticate the existing building but rather to profit from its bulky quality. The considerable room heights of the existing building relieved the problem of providing sufficient light posed by building depths of up to 24 meters while also helping to give the rooms a sense of spaciousness. The building was stripped back to the load-bearing structure and a second staircase was added to the circulation system.
This created a collective spatial figure that provides access to all the apartments and has a highly specific form that gives them addresses, so to speak. A kind of spatial jig-saw puzzle made up of interlocking single-storey apartments and maisonettes is developed between this circulation figure and the façade. Each apartment forms an individual piece that reacts in a specific way to its position in the building. Artist Jörg Niederberger uses colour to ‘stage’ this internal circulation figure. The building meets the Minergie P standard.
Otros proyectos de EM2N en HIC>
[wpcol_1third id=»» class=»» style=»»]
Commission
Study commission
Dates
Study commission 2007, planning 2007–2010, construction 2009–2010
[/wpcol_1third] [wpcol_1third id=»» class=»» style=»»]
Size
5’800 m2
Costs
CHF 20 Mio.
Client
Beat Odinga AG
[/wpcol_1third] [wpcol_1third_end id=»» class=»» style=»»][/wpcol_1third_end]